As soon as the windows are all in, and the balcony floor is sealed, then we are more or less watertight (well no front door obviously) - and then we can think about plastering soon.
26th July 2010 - More windows being installed
We have about 50% of the windows installed now. And they look very nice with the powder coated aluminium frames and the leadwork on the top parts. However, they have managed to install a clear glass window in one of the bathrooms and an opaque glass window in the study - but that is easy for them to sort out later!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment